Hạng F
22/10/09
8.170
30.383
113
<h3>Discovery High Over the Transfer Aisle</h3> A large yellow, metal sling lifts shuttle Discovery from the transfer aisle into High Bay 3 of the Vehicle Assembly Building.

In the bay, the shuttle will be attached to its external fuel tank and solid rocket boosters.

Photo credit: NASA/Jack Pfaller
Sept. 10, 2010
481055main_10-09-10-2_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
<h3>Discovery Lifted Toward High Bay 3</h3> A large yellow, metal sling lifts shuttle Discovery from the transfer aisle into High Bay 3 of the Vehicle Assembly Building.

The operation began Sept. 9 and wrapped up early Sept. 10.

Photo credit: NASA/Jack Pfaller
Sept. 10, 2010
481027main_10-09-10_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
<h3>Discovery Gets a Lift</h3> A large metal sling lifts shuttle Discovery from the transfer aisle into High Bay 3 of the Vehicle Assembly Building.

In the bay, the shuttle will be attached to its external fuel tank and solid rocket boosters.

Photo credit: NASA/Kim Shiflett
Sept. 9, 2010
481015main_10-09-09-6_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
<h3>Discovery Rolls to the VAB</h3> At NASA's Kennedy Space Center in Florida, shuttle Discovery pauses in between Orbiter Processing Facility-3 and the Vehicle Assembly Building (VAB) during a move called "rollover."

Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank.

Photo credit: NASA/Jack Pfaller
Sept. 9, 2010
480809main_10-09-09-1_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
<h3>Discovery Transported to VAB</h3> At NASA's Kennedy Space Center in Florida, shuttle Discovery begins to back out of Orbiter Processing Facility-3 during a move called "rollover" to the nearby Vehicle Assembly Building (VAB).

Once inside the VAB, the shuttle will be joined to its solid rocket boosters and external fuel tank.

Photo credit: NASA/Jack Pfaller
Sept. 9, 2010
480785main_10-09-09_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
<h3>Lift Sling in Place</h3> Workers in the Vehicle Assembly Building secure a large yellow, metal sling to shuttle Discovery for its lift from the transfer aisle into High Bay 3.

The operation began Sept. 9 and wrapped up early Sept. 10.

Photo credit: NASA/Kim Shiflett
Sept. 9, 2010
481001main_10-09-09-5_full.jpg
 
Hạng F
22/10/09
8.170
30.383
113
thì để tiếp tế và lắp ghép vào để hoàn thành trạm ISS, TRẠM này xây lâu lắm à, cả mưồi mấy năm, đa phần nhờ vào tàu con thoi mang lên
 
Hạng F
22/10/09
8.170
30.383
113
em làm biếng dịch quá, bác thông cảm nha, khi nào rãnh em up tiếp